We have chosen to continue to work further in the workshop where we are seeing good progress both in work trottlekassen and starboard elevator. The outer part of the rudder is now largely ready to be installed along with the rest of the rudder, when it is ready for this. The inner part of the elevator is now brought into the workshop and work to repair this is underway.

If any of us think that it makes good to be able to use the coldest winter months inside the workshop, are others clearly of a different opinion

report addresses these issues, not only as isolated health• CHF (III, IV) generic viagra online for sale.

. Ernst Knutsen has braved the cold and has dismantled the last of MG 17 mount with ammo crate from the center section. The access to be able to dismantle this equipment is as tight as it has been cold outside in Heinkel Hallen.

Sola Vision AS also braved the cold and has begun efforts to seal built for us
. This is so that use dehumidifier for lowering the humidity to a level that will clearly restrict a further corrosion in the parts stored where.

MG 17 lavett
MG 17 lavett
IMG_5471
The inner part of the starboard elevator is taken into the workshop
. The lack of outer part can be seen present during the major part of the tube
MG 17 lavett
MG 17 lavett