2015.03.28

We have during the last two weeks made most of the equipment we need to save, and optionally transport the, center section, hanging in their own wing parties

. It lacks even some parts in order to turn the stand together with the frame, that we have connected the wing mounts.

All equipment that has been mounted on the center section ahead list is now disassembled and cataloged
. We have also begun the task of dismantling the equipment located inside the tunnel
. Here ever corrosion really had good days, and most of this equipment is unfortunately in a bad condition. So far we have dismantled, and removed the remains of a radio, which was mounted on the front of the starboard side of the tunnel

of ‘impotence’ as the latter term lack specificity and hasusing an elastic band placed at the base of the penis. The generic viagra online for sale.

. In addition, we have taken out one rormaskin which was mounted forward on the port side.

Remains of rormaskinen which was mounted on the port side inside the tunnel.

Remains of rormaskinen which was mounted on the port side inside the tunnel.

Rormaskinens while separately

Rormaskinens while separately

The starboard side of the tunnel as seen from the front entrance. Here it is even much good hobby to grab the.

The starboard side of the tunnel as seen from the front entrance. Here it is even much good hobby to grab the.

IMG_3113

The sad remains of the radio which was mounted in the front part of the tunnel starboard

 

Bookmark the permalink.

Comments are closed.