2015.05.06

We have in the past two weeks continued its work to dismantle parts of the tunnel in the center section
. The main focus here is to get dismantled pump that has been thought used to be able to dump fuel in an emergency situation

nocturnal erections as well in this age group. However, the generic cialis selective.

. To operate this pump from the cockpit is a comprehensive system, comprising the characteristic German system of routing wire, which are hung bullets, inside the tube. The pump is enough in a reduced state, but it's fun to see how the maneuver arms and pulley are still reasonably intact and still operational.

Pump for dumping fuel. One can in the picture also see some of the pump control levers.

Pump for dumping fuel. One can in the picture also see some of the pump control levers.

Efforts parallel to dismantle rods and cranks associated flaps and ailerons of the center section rear.

A third task which must continue in parallel and continuously work to continuously make and document all parts. Obviously, this is a comprehensive work, but nevertheless very important in terms of a future reconstruction of the plane.

Bookmark the permalink.

Comments are closed.