2019.09.01

A new summer is almost past, and it is again time to think about what work needs and should be done on our Heinkel He 115. The situation is now a little different than what the was before we finished the work before the holiday

• Fasting blood glucoseNormal erectile process begins with sexual stimulation in cialis.

. There is an ongoing extensive and intensive works to finalize museum Bf 109 project. This work will be for a shorter period lay claim to very much of the area in the workshop. Accordingly, it be small area free for other work . We must, therefore, in this period limit our work into smaller parts that can be handled by the area we currently have available.

This restriction in the workshop area gives us extra time to think through what alternative methods we have available to preserve the aircraft originality of the longest possible period. It is the second and major players, that work to preserve the originality of sjøvrak of aircraft, done a lot of work to develop methods to stabilize the compositions of these wrecks. A method they have developed is to give the material an electrolytic treatment. We will in the future, and in cooperation with the other parties involved in He 115 project, make a new survey of which of the methods developed that may be relevant for our aircraft. This work will require that we make a wide range of requests among the actors has been involved in the development and use of the different methods.

Bookmark the permalink.

Comments are closed.