Again we have in the last few weeks efforts to dismantle the equipment from the tunnel in the center section

. It has also been dismantled more equipment senterseksjons rear
. We now have among others
. gotten out all equipment associated facilities for emergency pumping of fuel. This facility extended, with their pipes, containing the unique system in which wire is pulled through alternately steel sleeves of two different sizes, throughout the tunnel length

doctors had never asked them about their sexualthe overall cardiovascular condition of the patient. Is this How long does sildenafil last?.

. The pump and the float valve, there is little left of, while both operating systems and brackets have fared well on the fiord.

You can click on all the pictures to view them in full screen.

Pump for emergency pumping of fuel. Note the control system where it inside the tube goes wire. This then goes inside the steel sleeves of two different sizes.

 

Radio direction-finding antenna that were mounted on top of the center section between the ribs 9- 10
Radio direction-finding antenna that were mounted on top of the center section between the ribs 9- 10

IMG_3582