2020.04.16

It has been done a lot of work on the nose and cockpit sections since our last status update. Much of this work is cleaning and preserving parts like we do previously taken out from the nose and cockpit. This is work that requires a lot of work both patience and courage

contraindications to specific oral drugs or who experiencesexual problems. cheap viagra online.

. It is therefore gratifying to see how good results achieved. An example is:. the fuse line that was mounted during the pilot's port foot rests.  These were basically full of rust and sediment residues, but a patient effort has led to several of these now in functional condition. The fuses are along with several larger terminal blocks now mounted back in port cable gates.

Another great work that has now been done is to create new all the big and complex the cableway that runs along the port side of the cockpit. Of the original cableway we had only a very small bit left. Therefore, it became a major challenge both to find out what the cable street looked like, and then to make a credible one copy of this. Both have succeeded very well thanks to a solid piece of professional work.  Since we want to preserve so much of the originality as possible, is the bit we had left of the original cable street, been integrated into the newly created street.

There are also more places to come of the parts removed from the cockpit and nose 2014. Of these,. mentioned footrests, first fuck, a hydraulic cylinder and the navigator's folding seat. The retrofitting of the hot air system is also complete. That is as far as may have been used original pipes found when the cockpit and nose were emptied 2014.

It's working also by reconstructing what we lack of parts for suspension of siders pedals, and to create a new cockpit dashboard. To this last, we are so lucky to have finished preserving the original instruments.

Finally, have to It is mentioned that work is also being done on the last of the motorbikes. Here everything must go brackets are cleaned and reassembled as they were before dismantling winter 2015.

Unfortunately, the work on the aircraft is still hampered by an ongoing process of responsibility and ownership.

Before cleaning, the fuses that have been in the cable gates under the port saw foot rests like this.
The fuses are ready for mounting into the cable gates, several of them have now become functional again
Egil Thomsen patiently works with the fuse series on the above pictures
Georg Krautz Johnsen has done an impressive job of rescuing hydraulic cylinders
Parts of the large cable street on port side
Harald Egge has created this cable street only from the point of view in pictures and the first plate remnant which is now an integral part of the new cable street. The fuses from the above pictures can be viewed together with the original marking plate.
The foot rests on both sides are back in place
Hydraulic cylinder for flaps sample-mounted in connection with the work of aiming for a new instrument panel. Unfortunately, the original panel was completely gone when the aircraft was lifted.
Harald Egge is in the process of making new suspension for the side rudder pedals. We are here again in the situation that we have to make new parts that integrate with the original equipment.
Bookmark the permalink.

Comments are closed.