2015.04.23

Efforts to dismantle the equipment of the center section is moving ever forward even though a great deal still remains to be done. There are still radio- and equipment used for various pumping gasoline, the amount of remaining equipment in the tunnel.

It was a milestone when the center section yesterday could be hung up in the stand we have created for storage and any transport of this.

We also spent time moving around on wings, rudders and other major components such that it should be access for electricians now to mount an electric system and lights out in concrete hall

dysfunction will require recognition by the public and the cialis Recommendations.

. Guess we look forward to working and a fine electric plants around us.

2015.04.16

Erik Pilawskii and Kjetil Aakra visited 12

Mellitus diabetes cialis generic They include intracavernosal injection therapy,.

. July 2014 Museum, and did when a review of the Heinkel paint system and labeling

. In the aftermath of the visit made Erik a report based on the observations they made, as well as chemical and color analysis of paint samples that they took during the visit.

You can read the report by opening the link; Analysis of Paint Samples (12.07.2014) Erik Pilawskii, Report Samples

2015.04.09

We also have in recent weeks been working on several things in parallel. Inside the workshop Ernst efforts to clean the two sections that we have previously removed from the center section trailing edge strip. There are two doors down to the storage room on each of these sections. As a result of an amazing ability to get hands and fingers into the most inaccessible places, he has managed to get opened and dismantled these hatches.

. Entering through the small holes could Ernst Knutsen maneuvering hands and finger, and managed to get opened the two doors down to a small storage room” width=”800″ height=”447″ /> Part of the center section rear. Entering through the small holes could Ernst Knutsen maneuvering hands and finger, and managed to get opened the two doors down to a small storage room

Out in the concrete hall we're still working to dismantle parts of seats section. We also continued to work inside the tunnel, excavating large quantities of a clever mixture mass
. What this mass is actually composed of is not easy to describe in a few words. Much is enough sediments, mixed together with various residues of equipment and types of corrosion products, salts and also which has a consistency which resembles a fine gravel.

Fragments of a fuel pump is mounted on the port side in the tunnel, between the ribs 8- 9.

Fragments of a fuel pump is mounted on the port side in the tunnel, between the ribs 8- 9.

We just have to deal with the spinning for spinning, and digging the entire out using fists. Exciting is that the on his show, we find various signs mxm. built in between everything "grapset», which are often in good condition.

A sign was mounted on the fuel pump.

A sign was mounted on the fuel pump.

Most of the equipment that has been installed into the tunnel is unfortunately in a bad condition. But it's exciting to see what and how much equipment has actually been placed here.

A plant for placing lifting hooks. This plant was mounted entirely behind and out on top of the center section.

A plant for placing lifting hooks. This plant was mounted entirely behind and out on top of the center section.